September 2009  

transpixel
transpixel EM93wj On Power Plan Bridge
This is almost 100 feet above the road on a bridge ramp. we are above the trees and signals were poor at best on 432. No Cell coverage, to much noise on 60M. No contact on 10 Ghz transpixel
transpixel

EM93wj On Power Plan Bridge
This is almost 100 feet above the road on a bridge ramp. we are above the trees and signals were poor at best on 432. No Cell coverage, to much noise on 60M. No contact on 10 Ghz


Powered by Gallery v1.4.4-pl2 RSS